top of page
Ariel 1.jpeg

Projects

Road Resurfacing 2026

Resurfacing of main access road around the park. Upgrading to a tarmac surface that is durable and suitable for both vehicles and pedestrians. Project match funded by Place Based Investment Programme (PBIP), Ayrshire Rural and Islands Ambition (ARIA) fund and self funding. 

After 1.jpg

Dish Washing facility 2025

The installation of an indoor dish washing area for site users, with hot running water and waste amenities. Project part funded by South Kyle Wind Farm Community Fund via Dalmellington Parish Community Trust

Wash Hoose 2.jpg

Resurfacing Tent Area 2021

Lift existing tent area, level and resurface with new turf. Enclose area for privacy. Project was self funded by LDCCP

Tent Area.jpg

Hardstanding Pitch Resurfacing 2026

Following road resurfacing project when then sought funding to upgrade hardstanding pitches from previous rough terrane to screened road planning's. Project match funded by Ayrshire Rural and Islands Ambition (ARIA) fund and Place Based Investment Programme (PBIP). 

Pitch After 1.jpg

Toilet & Shower Block facility 2023/24

The installation of a fully accessible toilet & shower facility to meet the needs of all users, including access ramps and large accessible wet room. Project funded by Place Based Investment Programme (PBIP)

IMG_20240414_201706.jpg

Children's Trim Trail Play Area 2022

to incorporate a safe space for children to play using natural structural trim trail. Enclosed area for safe play. Project self funded by LDCCP

Play Area.jpg

©2020 by Loch Doon Caravan and Camping Park. Proudly created with Wix.com

bottom of page